What we’ve built.
Aerospace bracket — 38% cost reduction
Re-engineered a legacy 6-piece weldment as a single 5-axis billet part. 38% cost reduction, 41% lighter.
Read→Medical device — 14k units
From prototype to 14k-unit production in 9 months. Full validation per FDA Class II.
Read→Industrial enclosure — 24-month run
2,800 enclosures over 24 months. 99.7% on-time delivery. Zero quality escapes.
Read→