DemoManufacturing
Browse pages (14)
Browse other templates
Buy this theme →

What we’ve built.

Aerospace bracket — 38% cost reduction

Aerospace bracket — 38% cost reduction

Re-engineered a legacy 6-piece weldment as a single 5-axis billet part. 38% cost reduction, 41% lighter.

Read
Medical device — 14k units

Medical device — 14k units

From prototype to 14k-unit production in 9 months. Full validation per FDA Class II.

Read
Industrial enclosure — 24-month run

Industrial enclosure — 24-month run

2,800 enclosures over 24 months. 99.7% on-time delivery. Zero quality escapes.

Read