Cleaner manufacturing, audited.
ISO 14001 since 2018. Closed-loop coolant, chip recycling, on-site solar covering 38% of facility load. We publish scope 1 + 2 emissions quarterly.
2024 footprint
Where we are right now.
0%
Facility load on solar
On-site PV, 1.4 MW installed
0%
Chip recycling
All swarf reclaimed by alloy
0%
Scope 1 reduction
Vs 2019 baseline
0
Reportable spills
Last 36 months
The work behind the numbers
Closed-loop coolant
Coolant + cutting oil reclaimed in-house since 2019. Filtration + decanting bay reduces fresh-coolant purchase ~78%. Pays for itself every 14 months.
On-site solar
1.4 MW rooftop PV installed 2022. Covers ~38% of facility load on average; up to 92% on peak summer Sundays. Surplus exported.
Water reclaim
Coolant-mist wash water reclaimed via 3-stage filtration. Discharge water tested monthly; well below permit thresholds on every metric.
VFD + heat-recovery
Compressors + extraction on VFD since 2020. Heat from compressor stage fed into building HVAC. ~340 MWh/yr avoided.
ISO 14001 audited
External audit annually by SGS. Last audit (Mar 2025): zero non-conformances. Internal audit cadence is quarterly across all departments.
Customer-level reports
Customers over $250k/yr can request a per-shipment carbon estimate based on machine-hours + alloy. Pulled from MES, not industry averages.