How we work.

The unsexy version — timelines, deliverables, decision gates, and the moments where things tend to go wrong.

Phase 1 · Listen + frame

Discovery + site walk

Discovery + site walk

We meet on the site, walk every floor, talk constraints — budget, schedule, family pattern, neighbours, existing problems we should know about. We take photos. We listen more than we talk.

Read more
Programming brief

Programming brief

We write a 1,500–3,000-word memo back to you. What we heard, what the constraints actually mean, three or four candidate directions. The memo is the artefact — not a Figma file.

Read more

Phase 2 · Schematic design

Massing + site

Massing + site

Block diagrams, massing studies, code envelope analysis, basic structural feasibility. Output: 3–5 schematic options to choose between, with rough cost ranges per option.

Read more
Selected scheme + DD

Selected scheme + DD

We develop the chosen scheme to design-development level. Plans, sections, elevations, key details, finish strategy. Engineers (structural, MEP) come in. First serious cost estimate.

Read more

Phase 3 · Permits + CDs

Construction documents

Construction documents

Full CD package coordinated with engineering: drawings, specifications, schedules, joinery details. Reviewed internally + with you before filing.

Read more
DOB + Landmarks filing

DOB + Landmarks filing

We file in-house. We’ll never tell you a permit timeline we don’t believe. Plan-check usually 8–14 weeks for residential, 14–22 for commercial. Landmarks adds 6–12.

Read more

Phase 4 · Build

Site mobilisation + structure

Site mobilisation + structure

Demo (if applicable), excavation, foundation, framing. The phase where you can see the building grow week-by-week. We send weekly photo updates and a one-page progress note.

Read more
Rough-in + finishes

Rough-in + finishes

MEP rough-in, drywall, millwork, finishes. The longest phase by elapsed time, where most surprises surface. We pre-order long-lead items at the start of CD to stay ahead.

Read more
Punch + handover

Punch + handover

Final inspections, CofO, owner walk-through. We do a 30-day, 6-month, and 12-month follow-up after handover — included in fee. Snags get fixed.

Read more
12 months later

12 months later

We come back for a one-year walk-through. Settling cracks, hardware adjustments, anything you’ve noticed. Most clients have a list of small things; we work through it.

Read more